How to Start a Solar Installation Business in Oregon
Last verified: November 16, 2026
Starting a solar installation business in Oregon means working through two licensing tracks at the same time. The construction side is handled by the Construction Contractors Board (CCB), and the electrical side is handled by the Building Codes Division (BCD). Solar installation is construction of an improvement attached to real property, so your business needs a CCB license under ORS 701.005(5)(a).
This guide follows the order most installers use: registering the business, getting the CCB license, choosing an electrical license path, checking plumbing rules for solar heating and cooling, and handling tax and purchasing questions. Where this guide does not cover a figure or rule, it tells you which agency to confirm it with.
What You Need Before You Start
Collect these items before you file anything or quote a job. Fees are set by the agency that issues each license, so check the current amounts on that agency's page before you budget.
| Requirement | Issued or handled by | Cost in this guide |
|---|---|---|
| CCB contractor license | Construction Contractors Board (CCB) | $400 initial application beginning July 1, 2025, and $400 every 2 years to renew |
| Electrical Contractor license | Building Codes Division (BCD) | $125 per year for each place of business |
| Limited Renewable Energy Contractor (CLR) license | Building Codes Division (BCD) | $375 for 3 years |
| Limited Renewable Energy Technician (LRT) license | Building Codes Division (BCD) | $50 for 3 years |
| Plumbing limited specialty license | Confirm with the Building Codes Division (BCD) | $100 application and $150 renewal |
| Business name registration | Oregon Secretary of State Corporation Division | Confirm the filing fee on the Corporation Division's page |
The Steps to Start Your Business
Work through these steps in order. The CCB license comes before you bid, and the electrical and plumbing licenses should be settled before you promise a scope of work to a customer.
Step 1: Register Your Business Name
Form your business entity and register its name with the Oregon Secretary of State Corporation Division through the Oregon Business Registry. The Secretary of State's start a business guide walks through the filing choices for a new company.
Keep one point clear from the start. The Secretary of State says that registering a business name with the Corporation Division is not the same as getting a license. The name filing does not allow you to install solar. The CCB and electrical licenses below do that. The Secretary of State also notes that licenses are issued at the state level by profession or industry, and by some cities and a few counties, so check local requirements where you plan to work. The Secretary of State business FAQ covers this in more detail.
This guide does not cover the current filing fee or the documents you need for your entity type. Confirm both on the Corporation Division's page before you file.
Step 2: Get Your CCB Contractor License
Under ORS 701.021, a person who offers to undertake or bids to do contractor work must hold a current CCB license and an appropriate endorsement, unless an exemption in ORS 701.010 applies. Do not bid a solar job until the license is in hand.
The CCB sets these requirements for the applicant:
- You must be at least 18 years old.
- You must complete at least 16 hours of pre-license training from an approved provider.
- You must pass the Oregon exam. It has 80 multiple choice questions, and a passing score is 70 percent, which is 56 correct answers. The exam is open book with the reference manual. It costs $60 and is paid directly to the exam provider.
The person who passes the exam becomes the Responsible Managing Individual (RMI). The RMI must be an owner or employee who manages or supervises construction activities. Decide early who will fill that role, because the license is built around that person.
Plan for bonding and insurance before you apply. The CCB lists residential bond amounts of $25,000 for a residential general contractor, $20,000 for a residential specialty contractor and $15,000 for a residential limited contractor. Residential liability insurance minimums per occurrence are $500,000 for a residential general contractor, $300,000 for a residential specialty contractor and $100,000 for a residential limited contractor. Choose the license class that fits your scope with the help of the CCB specialty licenses page, then match your bond and insurance to that class.
The CCB requires workers compensation insurance if your business has employees, and it requires that coverage for commercial contractors. Ask your insurance agent to confirm the policy matches the license class and the type of work you plan to bid.
Check the CCB license page for the application steps and the current renewal terms. Then review the CCB continuing education page to see what applies to your license before you renew.
Step 3: Choose Your Electrical License Path
Solar panels and inverters involve electrical work, so the electrical side needs a license from the Building Codes Division (BCD) as well as your CCB license. Two options cover this work, and they differ in cost, scope and staffing.
- Electrical Contractor license: The fee to apply for or renew is $125 per year for each place of business, as set in the Oregon Revised Statutes chapter on electrical licensing.
- Limited Renewable Energy Contractor (CLR) license: This license requires an active CCB license, a registered name and a full-time renewable energy technician on staff. It has no exam and no continuing education. It costs $375 for 3 years and is limited to 25 kVA and 600 volts or less.
The Limited Renewable Energy Technician (LRT) license is a technician credential, separate from the contractor licenses above. It costs $50 for 3 years. It requires an approved apprenticeship through the Bureau of Labor and Industries (BOLI), an open-book exam and 4 CE hours per cycle.
Before you choose a path, confirm eligibility and the current rules with the Building Codes Division (BCD). The limit on kVA and voltage matters if your projects are larger than the CLR allows. Renewal details are on the Building Codes Division renewal page. Under those rules, a license can be renewed online within 45 days of its expiration date. Many licenses require continuing education to be registered before renewal. A license that has been expired for more than one year requires retesting.
Step 4: Check Plumbing Licensing for Solar Heating and Cooling
If your business will install solar heating and cooling systems, that work falls under a plumbing limited specialty license. The application fee is $100, and the renewal fee is $150. The license also requires a number of hours of approved training or experience, which you should confirm before you apply.
Confirm the current plumbing rules with the Building Codes Division (BCD) before you sell heating or cooling work. If your scope is electrical only, this step may not apply to you.
Step 5: Research Incentives Before You Quote
Incentive programs for solar change often. Check Energy Trust of Oregon and your local utility for the programs that are open when you quote a customer. Program rules and eligibility can change between quotes, so confirm them again for each job.
This guide does not list current incentive amounts. Use the program administrators' own pages and your utility's current program information as your source.
Step 6: Handle Tax and Wholesale Purchasing
The Oregon Department of Revenue states that Oregon does not have a general sales or use/transaction tax. Read the Department's statement on the Department of Revenue sales tax page before you set your pricing structure.
The Oregon Secretary of State says the state does not assign resale numbers or a reseller's permit for wholesale purchases. For wholesale buying, the business registry number is the number you use. The Secretary of State business FAQ explains this in its own words.
This guide does not cover payroll, employer registration or federal tax setup. Confirm those with the Oregon Employment Department and the Internal Revenue Service (IRS).
Tips for Avoiding Common Mistakes
- Bidding before licensing: ORS 701.021 requires a current CCB license before you offer or bid contractor work. Put the license ahead of your marketing.
- Treating the name filing as the license: Registering the business name with the Corporation Division does not give you a license. Keep the name filing and your CCB and electrical licenses on separate checklists.
- Missing renewal dates: The CCB renewal is $400 every 2 years. Under ORS 701.992, a person who violates ORS chapter 701 or a CCB rule may be assessed a civil penalty of not more than $5,000 for each offense.
- Letting an electrical license lapse: Building Codes Division licenses can be renewed online within 45 days of expiration. Many need continuing education registered before renewal, and a license expired for more than one year requires retesting.
- Quoting old incentive information: Incentives change often. Recheck Energy Trust of Oregon and your utility before every quote.
- Skipping the insurance review: If you have employees, workers compensation insurance is required. Confirm your liability limits against the CCB minimums for your license class.
What Results to Expect
A properly licensed business may be able to offer and perform solar work in Oregon once its CCB and electrical requirements are met. The license does not guarantee customers, revenue or any particular volume of projects. Your results will depend on your market, your pricing and how well you manage the compliance steps above.
Plan for the licensing and insurance work to come before your first bid. Expect the early weeks to involve filings, training, exams and insurance paperwork rather than installation work.
Registering your business name is not the same as getting a license. Keep the Corporation Division filing and your CCB and electrical licenses on separate checklists so none of them gets missed.
Frequently Asked Questions
Do I need a CCB license to install solar panels in Oregon?
Yes. Solar installation is construction of an improvement attached to real property, so the business needs a CCB license under ORS 701.005(5)(a). Confirm the license class that fits your work with the CCB.
Can my business name registration serve as my license?
No. The Oregon Secretary of State says that registering a business name with the Corporation Division is not the same as getting a license.
How much does the electrical side cost?
The Electrical Contractor license is $125 per year for each place of business. The Limited Renewable Energy Contractor license is $375 for 3 years, and the Limited Renewable Energy Technician license is $50 for 3 years. The right path depends on your business setup, so confirm eligibility with the Building Codes Division (BCD).
Does Oregon charge a general sales tax on solar work?
The Oregon Department of Revenue states that Oregon does not have a general sales or use/transaction tax. Read the Department's sales tax page for the details, and consult a CPA about your own situation.
Are there incentives for solar installations in Oregon?
Incentive programs change often. Check Energy Trust of Oregon and your utility for current programs, and confirm them before you quote a customer.
Disclaimer
This content is informational only and is not legal or tax advice. Consult an attorney or CPA before you form your business, sign contracts or make tax decisions.
Sources
- Oregon Secretary of State start a business guide
- Oregon Secretary of State business FAQ
- Oregon Revised Statutes chapter on construction contractors
- Construction Contractors Board license page
- Construction Contractors Board specialty licenses page
- Construction Contractors Board continuing education page
- Oregon Revised Statutes chapter on electrical licensing
- Building Codes Division license renewal page
- Oregon Department of Revenue sales tax page